10/11/2021
Ba Ria - Vung Tau

The system is installed in parallel with the construction phase of the plant to ensure the expected production schedule of this plant.

The LPG system installed by DATA Energy includes:

  • LPG tank 20 tons, 2 vaporizers capacity 600kg/h
  • Technological Equipment For LPG Intake Line From Pump Head To Tank
  • Equipment From Technology Cluster To Main Valve
  • Equipment For Water Line Cooling Tank
  • Electrical Systems for Vaporizers and Alarms